The work began with major structural operations: foundation repairs, treatment of load-bearing masonry and the creation of new floor levels. The added storey created extra floor area, integrated into a coherent functional layout. All utilities were fully replaced: high and low-voltage electrics, plumbing, air conditioning.
The technical scale of the project was matched by close attention to how the space would be used. A full home-automation system – remote-controlled openings, alarms and lighting – gives the spaces a high level of comfort and security. A dedicated screening room, combined with careful soundproofing, rounds out a programme designed for demanding users.















